Romero, Chile
Total output: 120 MW
Number of installed soral panels: 479.050 pcs
Type of anchorage: MTS
Lead time: 20 weeks
Stand: Krinner Flex V.
A desert terrain at an elevation of 1,200 above sea level at the foot of the Andes. Extreme temperature range. Implementation was carried out after morning frosts at +50° C in the afternoons. Our staff worked on quality assurance tasks and local logistics management.